Phases of an integral reform. Step by step

PHASES OF AN INTEGRAL REFORM. STEP BY STEP.

Fases de una reforma integral | DESMON

How to carry out the phases of an integral reform of a flat or office? That is the big question asked by people who want to change the face of their home or workplace. And above all, what are the phases of a complete renovation.

The phases of an integral reform begin long before knocking down a wall. This means that there is work to be done prior to the work, including contacts with the administration. When all the paperwork is in order, the next phases of an integral reform can begin.

The renovation project involves professionals from different fields who must be coordinated in order to work together without disturbing each other. In addition, it is necessary to set a timetable and respect it as much as possible.

In DESMON we are specialists in integral reform projects for homes and offices. We work on workplaces and offices, flats and shops. Our experience has allowed us to know perfectly what are the phases of an integral reform. With this post we want to explain what is the step by step to obtain good results and to do it in the stipulated time.

PHASE 1 – PLANNING THE INTEGRAL REFORM

Like any good journey, the integral reform of a flat or office starts with planning. It is important to set a closed budget that includes all the phases of the integral reform. The budget is the fundamental roadmap to follow. In this way, last minute surprises and loss of time for the professionals and the client can be avoided. Therefore, it is necessary to take the time to calculate the budget of the work with the forecast of different possible scenarios.

Fases de una reforma integral| Desmon

PHASE 2 – OBTAINING PERMISSIONS AND TIMETABLE

Actually, we could have considered this step as step 1a, because it is part of the planning. It is essential to obtain all the building permits and to set out each of the phases of the renovation project in a timetable.

This phase of the integral reform is a basic step and it should be noted that time is a very important factor. Obtaining permits can sometimes take a long time and, depending on the difficulty of the work, the entire renovation process can also take a long time.

Fases de una reforma integral| Desmon

PHASE 3 – DEMOLITIONS

Now we start with the stages of the integral reform. This involves demolishing the walls that are to be knocked down and leaving the flat or office bare.

At this stage it is good to bring together clients and professionals to see together how the new walls and the planned distribution of spaces are going to look. It is true that it is very difficult to get an idea of how the property will look after the complete renovation. For this reason, DESMON strongly recommends professional support at all times.

It is important to establish questions such as how much time will be spent in each room. If it is necessary to set up study areas, it is important to bear in mind how much light will enter. Also, it is necessary to find the best orientation for the rest areas and take into account the insulation of the building.

Fases de una reforma integral| Desmon

PHASE 4 – ERECTING WALLS AND CHOOSING THE LOOK

There comes a fun moment in the phases of the integral reform. The walls have to be lifted and colours and appearance have to be chosen. Similarly, you will have to pay attention to the bathroom tiles and the layout of the kitchen or the seating areas, if it is an office. Choosing the materials can always bring new ideas to the renovation.

Fases de una reforma integral| Desmon

PHASE 5 – ELECTRICAL INSTALLATIONS OF THE INTEGRAL REFORM

The electrical installation takes up a large part of the time dedicated to the integral reform of a house or office. It is crucial to know where the light points are going to be and what type of lamps are going to be installed.

Similarly, it is necessary to plan the placement of sockets. At DESMON we always try to place more than necessary. There are always new devices or systems that need power supply. It is also necessary to fix the place where the air-conditioning or air-conditioning units of the building will be placed.

This phase of the integral reform is one of the slowest and most delicate. However, if you work with foresight and foresight, the final comfort of the building will be optimal.

Fases de una reforma integral | Desmon

PHASE 6 – LAYING WINDOWS AND TILES

Now it is time to lay the tiles in the kitchen and bathroom. At this stage of the integral reform the windows and possible aluminium carpentry are also installed. This phase can be combined with the work of the electricians without any problems. However, it is always a good idea to check the availability of the professionals.

Fases de una reforma integral | Desmon

PHASE 7 – INSTALLATION OF THE FALSE CEILING AND RAISED FLOOR

If it is a complete renovation of an office or workplace, it is advisable to spend time on the floor and ceiling in this phase. By this we mean that the false ceiling is almost essential in workplaces. It is a convenient way of concealing installations and the models available on the market make it easier to access possible faults.

We also recommend the installation of raised access floors. This makes it possible to distribute electrical wiring, fibre or data connections throughout the office. Afterwards, all you have to do is pull out the connection to the employees’ desks. Everything will be hidden under the floor and, in this case, it will also be enough to lift the tile to solve any possible faults.

Fases de una reforma integral | Desmon

PHASE 8 – KITCHEN AND BATHROOM INSTALLATION

The installation of electrical appliances or bathroom fittings is the moment when the client begins to sense the final aspect of the integral reform. Choosing the models is a moment of great excitement because it means using the latest technology.

In this moment of the integral reform phases, it is important to have a clear mind. The reason is simple, electrical appliances and sanitary ware are usually the most expensive part of the whole project. DESMON always advises you to consult several options and suppliers until you find the price that fits the budget set at the beginning of the renovation.

Fases de una reforma integral | Desmon

PHASE 9 – INSTALLATION OF FLOATING FLOORBOARDS AND WALL PAINTING

The installation of the flooring is the first step in “dressing up” the flat or office. In a home, parquet or laminate flooring is always a good choice. It is a warm material that can be found in different hardnesses and models. If it is an office, it is important to take into account the number of people who will access the premises in order to lay a resistant and easy-to-clean floor.

Regarding the colour of the paint on the walls, it is advisable to think about the style you want to give to the different rooms. Neutral colours are always an interesting option because they usually combine with different types of decoration. It is also possible to cover a wall with wood and combine it with textiles or paint on the opposite wall.

The work is at that point in the phases of an integral reform where the client begins to clearly see the project he had in mind.

Fases de una reforma integral | Desmon

PHASE 10 – FITTING THE CUPBOARD DOORS AND THE FINISHING TOUCHES

The fitting of the wardrobes often signals that the end of the renovation is near. In a home, it is best to opt for built-in wardrobes because they save space and blend in very well with the bedrooms. In addition, the choice of doors adds to the decoration of the sleeping area.

Now, in offices, built-in cupboards are also an interesting alternative. Paper documents can be kept under lock and key. To storage space in the workplace, it is necessary to install desks, furnish meeting rooms and provide ergonomic chairs for employees.

Fases de una reforma integral | Desmon

DESMON, THE BEST ALLY IN ALL THE PHASES OF AN INTEGRAL REFORM

It is essential to have professional advice at all stages of a house renovation. The technical vision of the work is very useful when it comes to making decisions. Good advice from experts can solve problems and determine the placement of one material or another. The client only wants to see the end of the work. The professional is able to have an overview of all phases of the complete renovation.

At DESMON we have a multidisciplinary team that is responsible for the design, manufacture and assembly of all our elements. We are specialists in customised solutions and we can work on tailor-made projects.

If you need to undertake a complete renovation of your home, your business or your office, contact DESMON. We are professionals and we have materials of extraordinary quality.

Fases de una reforma integral | Desmon
Recommended Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search

sillas de ordenador para oficinas - Computer chairs for modern officesReformar un despacho profesional | DESMON